Prepared By:
Revision: | Date: | Name: | Signature: | Revision Description: |
0 | ||||
1 |
Approval:
Revision: | Date: | Name: | Signature: | Comment(s): |
0 | ||||
1 |
[PLACEHOLDER TEXT - State the purpose of the procedure. Mention the application name and perhaps business requirements. This template is for on-prem applications.]
[PLACEHOLDER TEXT - State the objectives of the DRP document such as providing information to direct teams in the failover to a DR site.]
[PLACEHOLDER TEXT - Describe whether the scope of the application is partial, tends beyond the application, or if it is always grouped or tested with another application.]
[PLACEHOLDER TEXT]
[PLACEHOLDER TEXT]
[PLACEHOLDER TEXT - If an application runbook exists or any other operational support documents, provide links here]
[PLACEHOLDER TEXT - List the people/roles responsible for tasks related to the failover, testing, or management of this application.]
[PLACEHOLDER TEXT - List the sequential failover steps including any pre-requisites. Provide instructions for each DR scenario.]
[PLACEHOLDER TEXT - List the sequential fail-back steps.]
[PLACEHOLDER TEXT - List the sequential failover steps to perform a DR test of this application. Include a step requiring an approved change request to be processed. Provide an instruction per DR scenario.]
[PLACEHOLDER TEXT - List the fail-back steps from a DR test.]
[PLACEHOLDER TEXT - List the steps necessary to validate the application once failed over to DR. These steps are typically performed by the application manager or the business owner (if participating).]
[PLACEHOLDER TEXT - A qualitative description of the application.]
[PLACEHOLDER TEXT - A technical description of the architectural makeup of the application.]
[PLACEHOLDER TEXT - Enter the server listing.]
[PLACEHOLDER TEXT - Enter the upstream and downstream dependencies.]
[PLACEHOLDER TEXT]
[PLACEHOLDER TEXT - Enter the VM information.]
[PLACEHOLDER TEXT - Provide a diagram of the application, this is typically a Visio diagram.]
[PLACEHOLDER TEXT - List all DR scenarios the application is designed for.]
[PLACEHOLDER TEXT - Period within which minimum levels of service and/or products and the supporting systems, applications, or functions must be recovered after a disruption has occurred. X amount of hours.]
[PLACEHOLDER TEXT - Point in time to which data must be recovered after a disruption has occurred. X amount of hours.]
[PLACEHOLDER TEXT]
[PLACEHOLDER TEXT - Add any necessary attachments.]